Kevin C. Wong

DC Adventures Campaign - Teksters Central (née Kobra Design)


Teksters Central is the secret superhero base under the former Kobra Design's building. The upper building is a small four-story building. The base itself is three underground levels with a connecting train tunnel to a remote garage.

Characteristics are based on the Viper's Nest in Champions RPG 3E rulebook (p. 108). Cost is in Equipment Points (1 Power Point = 5 Equipment Points). The base currently lacks a Laboratory to examine alien tech, Personnel to man the security and computer systems, and cleaning services.


CHARACTERISTICS (Total PP Cost [4])

Teksters Central [20] Headquarters (p. 159)

Size: Medium [2] Mansion or cave complex
Toughness 10 [2] Because it's underground
Power Level 10 Based on campaign PL
Classrooms [1] 3 rooms, 27 seats in each room + 3 meeting rooms
Communications [1]
Computer [1] No AI/semi-AI capabilities
Concealed [2] +15 DC to find
Garage [1] Half mile from base, connected by monorail shuttle.
Gym [1]
Holding Cells [1] 4 cells
Infirmary [1] 5 beds
Library [1] 6 bookshelves worth
Living Space [2] barracks for 50 (100 hot bunking) + 9 bedrooms + commissary + kitchen
Power System [1] Green Giant Pearl
Security System [2] DC 25 security
Workshop [1] Armory + Computer Shop + Firing Range. Vehicle repair shop in Garage.

Vehicle Pool [0] All vehicles taken by retreating Kobra troops.



Appearances


  • Issue 4 - Heroes investigate Kobra Design.
  • Issue 5 - Heroes assault secret base beneath Kobra Design.
  • Issue 6 - Heroes drive villains from KD base. Mayor Lee secretly leases base to San Francisco's newest superhero team.
  • Issue 14 - Hack is hired as a freelancer.

External Links